how to calculate the dry wt of sand and cement for a
required design mix?for ex:M20
No Answer is Posted For this Question
Be the First to Post Answer
explain five benefits of using standard terminology in the measurement process?
per 1 cumt concrete how much manhours is required including shuttring,steel etc.,for slab & foundations
Which is the direction of negative angle?
Why provide strripus in a column minimum and maximum spacing.
what is the difference between lap length & development length of reinforcement steel bars
1 Answers APGenco, Consolidated Construction Consortium Limited,
Why we take 162.2 in (d*d/162.2) to calculate weight of steel???
what is the cutting length of 90 degree bend in four corner ring in column of 8mm dia size of column 450mmx250mm of clear cover 20mm?
13 Answers Abhiram Infra Projects, Al-Darwish, Sobha Developers,
what is lap length? why it is required?
What is the general specifications of a bituminous pavement road?
1)pile is of 200mm dia.-- a)tell the cutting length of ring considering 2cm cover b) tell the quantity of concrete considering pile length as 3m c) tell concrete quantity in bulb
What is the Specific gravity of cement?Water?
please help me to find a mix design ratio for M40....