how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
No Answer is Posted For this Question
Be the First to Post Answer
how can we calculate steel value, depending on load
define prestressing? compare prestressing with post tensioning?
HOw to find the depth of foundation?
How do we say The LAP LENGHT is 50D to 60D ?????
As per thumb rule cement required per 1 cum of M20 concrete is 411Kg/cum(1.57/5.5=0.285cum of cement i.e 0.285*1440=411Kg).But as per PWD rate analysis cement required is 347Kg/cum.the difference is 64Kg.This kind of difference is coming every grade of concrete.Can you give perfect suggestion regarding this.
what is the thikness of binding wire please quick response
Mention what are the composition of a landfill?
How will you provide reinforcement from corrosion?
pls give me some basic informations in construction of a structure?
Brick work how many days curing and at any concreting pl
how to creat mix m-20? and how to check shuttering & how is mark layout at open ground
when we select buildup beam
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)