Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Brick work how many days curing and at any concreting pl

Answers were Sorted based on User's Feedback



Brick work how many days curing and at any concreting pl..

Answer / koshik

Brick work :-7to10 days
All concreting:-14to20days

Is This Answer Correct ?    11 Yes 0 No

Brick work how many days curing and at any concreting pl..

Answer / dileep naik

It is depending upon weather condition.
Generally Brick & concrete work cured atleast 7days.

Is This Answer Correct ?    3 Yes 1 No

Brick work how many days curing and at any concreting pl..

Answer / sudarsan

7days

Is This Answer Correct ?    1 Yes 1 No

Brick work how many days curing and at any concreting pl..

Answer / abdul aziz

Concrete 7 day 21 days depend on weather or no need curing use thermal blanket for self curing or curing compound chemicals

Is This Answer Correct ?    0 Yes 0 No

Brick work how many days curing and at any concreting pl..

Answer / anita

20 days

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

what are the volumes of soil stabilization mix of cement,lime and sand in the ratio of 1:1:10 respectively in 1m3?

1 Answers  


what are the criteria for choosing the span for the bridge (highway bridge)

4 Answers  


Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,

1 Answers  


what is levelling staff least count

13 Answers   L&T,


60-70 grade of Bitumen is VG-30 ?

0 Answers   Sarthak Contracts,


types of piles?

4 Answers  


1) what is the seewage discharge per person per day taken for design purpose as per IS codes? 2) how to convert gauge to MM like if we measure 18G as our door frame then how much is it in MM ? 3) how much binding wire is required ti tie 100kg steel ? 4) while making rings in steel reinforcement , whether the corners of rings are deducted to take out cutting length ? 5) how much carbon content should be there in steel used for construction purpose? 6) what are fe415 & fe 500 and which bars are used in general civil works?

1 Answers  


Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40

10 Answers   ACC, Awasthi Construction, Bitulink, Mir Akhter Hossain, SOT,


what is a weight of 10mm, 20mm, 40mm aggregate ?

1 Answers  


Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an example.

9 Answers   JTP, L&T,


Which is the most prominent tower of world?

0 Answers  


Every Engg. know that =dia*dia/162.2 is Steel weight Formula, But very less people Know that orgin of 162.2 asumption.

3 Answers   ATS, Eurotech Construction, Juniper Networks,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)