Brick work how many days curing and at any concreting pl
Answers were Sorted based on User's Feedback
Answer / koshik
Brick work :-7to10 days
All concreting:-14to20days
Is This Answer Correct ? | 11 Yes | 0 No |
Answer / dileep naik
It is depending upon weather condition.
Generally Brick & concrete work cured atleast 7days.
Is This Answer Correct ? | 3 Yes | 1 No |
Answer / abdul aziz
Concrete 7 day 21 days depend on weather or no need curing use thermal blanket for self curing or curing compound chemicals
Is This Answer Correct ? | 0 Yes | 0 No |
How Mney Layers in 8mm plywood
what is the mix design for M:60 with micro silica andmetakaoline?
what is the criteria for placing reinforcement in footing and slabs e.g which span have to place first.
4 Answers Al Futtaim Carillion, NTPC,
can i get civil engineering test papers.......?????
how can calculate material in 1:1.5:3 ratio in concrete
plz. how many times required for compacting subbgrade in road way & how many water required?
How to calculate woden area in sft and Cft
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
who to find building iron rod strenth
What is softsoil? what kind of foundation?
HOW YOU CAN DETERMINE THE WEIGHT PER METER OF STEEL RODS EASILY?
what post do you prefer to work in this company and why do you think you can serve better in such position?