minimum dia of manhole cover should be
A] 50 cm
B ] 100 cm
C ] 75 cm
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
What are the ingredients of pre-stressed concrete?
how to know the one way or two slab
3 Answers ASC, Harmal Enterprises,
what are the Cement Coefficient for Block Work & plastering Work?
What"s mean by water bound macadam road(WBM)?
there is a residential building L = 20' B = 30' H = 20' stairs L = 3' H = 20' calculate the numbers of Threads and risers from stairs with formula
Specific gravity of cement?
how to absorb to site basic corrections? which are the important correction?
how many type of billing
difference between minor and major bridge.
A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?
I want to construct 1850 square ft of rcc apartment , with stilth parking , the site requires 18 ft of pile foundation , the apartment will be above ground parking , can some one guide me about the cost of construction of such structure in Pune ?