What are the tests to be conducted on cement?
Answers were Sorted based on User's Feedback
Seive test, Initial setting time, Final Setting time, Soundness test.
| Is This Answer Correct ? | 15 Yes | 4 No |
Answer / n. rajesh guttedar
1) Fineness test,
2) setting time test Initial & final,
3) Soundness test,
4) Plasticity tests are conducted on cement.
| Is This Answer Correct ? | 7 Yes | 1 No |
Answer / mukunda m y
fineness, initial and final setting time, consistency, soundness and compressive strength of cement.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / prashant pawar
Laboratory Test :-
1. Consistency Test
2. Fineness Test
3. Soundness Test
4. Compresive Test
5. Initial and Final setting Time Test
On Site Test:-
1. Date of packing
2. Colour
3. Rubbing
4. Hand Insertion
5. Float Test
6. Smell Test
7. Presence of lumps
8. Shape Test
9. Strength Test
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / fasil n.e.
fineness test, consistency test. soundness test, setting time test, strength test, heat hydration, chemical composition test
| Is This Answer Correct ? | 3 Yes | 2 No |
What is Bearing Capacity of Soil? How will you calculate for a particular type of Soil?
5 Answers Nagarjuna Construction,
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
Kindly tell me a book name to study for BIS exam
how many bricks required for below volume 1. depth filling 0.00 Qty 1.61 & Unit Cu.M 2. D-Filling 300 Qty 2.0 & Unit Cu.M 3. D.Filling 450 Qty 2.24 & Unit CU.M 4. D-Filling 600 Qty 2.44 & Unit Cu.M
how 2 find out slap steel quantity ? plz help me
what is calculation of cement, snd of 1:4 16mm,12mm plastring
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
What is 1/8 on the architect ruler denotes?
what is the difference between stress and pressure??
How many BRICKS required for 10 cumic of brickwork
what is mean by centrifugal force which is act in vehicle on superelevation of road?
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)