internal dia of sewer pipe should not be less than
A] 15 cm
B ] 20 cm
C ] 25 cm
Answers were Sorted based on User's Feedback
what is the cover for column,beam & footing?
how much quantity required on weight of cement & on weight of sand for 1:4 ratio mortar?
Which code describes the tolerances limit for undulation in the roads or pavements ?
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
WHAT YOU MEAN BY PROOF STRESS?
which is higher specific gravity or bulkdensity
quantity of cement required for M35 grade reinforced cement concrete
The concrete slump recommended for beams and slabs; is?
How to calculate Rate of 10 cum of Brick masonary,if the rate of material are as fallow? sand=Rs.500/mt Brick=Rs.5/brick Labour=Rs 300/day Free issue=cement+water+electicity.
how to calculate sump capacity
2 Answers AVS, KMC, Personal Assistant, Shrey Associates,
what"s the cement, sand, aggregate(consumption) quantity for 10 cm thick roof slab (1:2:4)
rate analysis,what is PERT, TMT ,UPVC
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)