Civil engineering
Answer / rambabu
I am completed b.tech civil engineering I can face an interview so what are the questions asking possibility tell me&also how to face interview
| Is This Answer Correct ? | 0 Yes | 0 No |
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
How to rectify thermal cracks (2mm wide, 9mm deep aprx. ) developed in tremix finished concrete floor?
what is the use of water bar in water tank and is this an extra item in estimate?
How To Measure Honey Comb Full Brick Work, Can we deduct Hole, If Yes, how to Calculate Rate Analysis
Sir I am from jntuk R13 regulation...... Is there any chance to leave credits
how many liters of water required for 1cu.m concrete?
what is preposition of M-5 grade
3 Answers Montag Infrastructure,
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
What do you mean by TOLERANCE in steel
what is normally consolidated clay and over consolidated clay?
12. Have you ever been asked to leave a position?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)