what is preposition of M-5 grade
Answers were Sorted based on User's Feedback
Answer / ranjithkumar.t
M-5 = 1:5:10
1 = cement use ratio for 1 cubic meter
5 = sand use ratio for 1 cubic meter
10 = Aggregate use ratio for 1 cubic meter
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / sahilshah.civil@gmail.com
Concrete grade M 5 have mix 1:4:8 (Cement: Sand: Metal)
| Is This Answer Correct ? | 0 Yes | 3 No |
Difference between Statics, Dynamics, Kinetics, Kinematics
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
What is pre-stressed concrete?
Explain what are the skills required to become an architect?
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
What is the difference between gray swr pipe & red swr pipe
what is the use of beam end forces while using a staad ? wha they are show
How to determine thee cut length for steel reinforcement bars in R.C.C design
in 1 cub/mt how much brick will come of 4" & 6"
which type of cement uses for R.C.C. & why?
2 Answers Ideal Construction,
how to calculate water cement ratio?
6 Answers IVRCL, Saroj Group, Sobha Developers,
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)