the water is flowing through a velocity of 1.5m/s in a pipe
of length 2500m and dia 500mm. at the end of pipe a valve
is provided. find rise in pressure
1. if the valve is closed in 5 seconds.
2. if the valve is closed instantaneously.
take value of c = 1460m/s, pipe to be rigid and bulk
modulus of water - 19.692x10' n/sqcm
No Answer is Posted For this Question
Be the First to Post Answer
what is the minimum spacing required for slab & beam reinforcement
The Instrument used to determine colour of water is called A] Turbidimeter B] osmoscope C] Barometer
what is the main difference b/w compaction and consolidation
why mixing marble powder reduces setting time of cement
How we calculate the service time of buildings
What is the amount of brick in cum we get in a BIG LORRY approx ??
WHAT IS THE RATIO OF CEMENT:SAND:COARSE AGGREGADE IN M-20, M-25, M-30, M-35, M-40, M-45, M-50 CONCRETE?
what is the defination of an ideal fluid?
what is right & short method of measurement of slab&beam
how much distance to provide lap lengths in footings,plinth beams, columns, beams& slabs
For a RCC section with congested reinforcement , what is the compaction factor
3 Answers Arihant, GMR, Gulf International Contracting, NBCC,
how much quantity of cement,sand and water required for 1 sq feet flooring work .
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)