Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


the water is flowing through a velocity of 1.5m/s in a pipe
of length 2500m and dia 500mm. at the end of pipe a valve
is provided. find rise in pressure
1. if the valve is closed in 5 seconds.
2. if the valve is closed instantaneously.
take value of c = 1460m/s, pipe to be rigid and bulk
modulus of water - 19.692x10' n/sqcm


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Civil Engineering Interview Questions

what is the minimum spacing required for slab & beam reinforcement

5 Answers   Gammon,


The Instrument used to determine colour of water is called A] Turbidimeter B] osmoscope C] Barometer

1 Answers  


what is the main difference b/w compaction and consolidation

2 Answers   KCP,


why mixing marble powder reduces setting time of cement

3 Answers   NUST,


How we calculate the service time of buildings

0 Answers   SPML,


What is the amount of brick in cum we get in a BIG LORRY approx ??

3 Answers   Pegasus,


WHAT IS THE RATIO OF CEMENT:SAND:COARSE AGGREGADE IN M-20, M-25, M-30, M-35, M-40, M-45, M-50 CONCRETE?

2 Answers   L&T,


what is the defination of an ideal fluid?

7 Answers   NTPC,


what is right & short method of measurement of slab&beam

0 Answers   L&T,


how much distance to provide lap lengths in footings,plinth beams, columns, beams& slabs

9 Answers   NCC,


For a RCC section with congested reinforcement , what is the compaction factor

3 Answers   Arihant, GMR, Gulf International Contracting, NBCC,


how much quantity of cement,sand and water required for 1 sq feet flooring work .

0 Answers   JMD Group,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)