Explain what is PRT – how many types of PRT is used?
Answer / tejas d
PRT is Production Resource Tool which is a term used in SAP for the actual tools or equipment used in Manufacturing industry but are not consumed in production process.
E.g. Hammer, Gauges, bearings, etc.
Is This Answer Correct ? | 0 Yes | 0 No |
What is planning file entry and Where can we use
What is the uses of production scheduling profile and what the configure have you done current project
0 Answers Cognizant, Patanjali Ayurved,
What is known as 'demand management'?
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
Do you have several alternative BOMs for a material, depending on the manufacturing procedure or lot size, for example (multiple BOM)?
Different types of consumption based planning.
Integration of PP with MM , Integration of PP with SD .
What is planning time fence and where will be reflect
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
Explain how can you create production order without routing and bom?
What is MTS and MTO and the difference between them?