In the monthly lot size proc, how to generate lot at the end of Period?
No Answer is Posted For this Question
Be the First to Post Answer
which process is complex ? REM or Discrete manufacturing.
Explain the mrp controller and their uses.
Do you have several alternative BOMs for a material, depending on the manufacturing procedure or lot size, for example (multiple BOM)?
what is Standard order type
what is the difference between backward scheduling and forward scheduling ?
What is time phased Planning?
cutover activities in sap
Can't one material be assigned to more than one operation in a routing, why?
What is REM or What is REM profile
How do you integrate HR (employee) with PP?
If the scenario is''Party is supplying some material we have to do the some processing operation on it, how it cab be handled in SAP"
how to know a component create date after WO released