Difference between PP and PI.
No Answer is Posted For this Question
Be the First to Post Answer
What are the reports generated in product cost controlling information system?
Have you used Pull list or back flushing in REM?
what is group bom? Is it possible to attach the drawing for a material to bom? How?
What are mandatory fields for PP configuration
what are the problems you faced in MRP?
What are the parameters are there in Order type or in dependent para. config?
What is "work center" in sap pp and what is the use of data in work centers?
What is COIS?
What is planning file entry
What is the use of t-code cs20 in bom?
how to create report in sap pp
What is mrp procedure