Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How much stirrups spacing required for.column reinforcement?

Answers were Sorted based on User's Feedback



How much stirrups spacing required for.column reinforcement?..

Answer / sridhar k

Minimum 125mm to 150mm spacing

Is This Answer Correct ?    4 Yes 0 No

How much stirrups spacing required for.column reinforcement?..

Answer / senthil473

as per is 456-2000, the lateral ties may be given the spacing not more than,
1) least lateral dimension
2) 16*dia of the bar used
3) 300 mm
the least of th above may be given

Is This Answer Correct ?    0 Yes 0 No

How much stirrups spacing required for.column reinforcement?..

Answer / zahid kaleem

Stirrups are not used in column.....lateral ties are used in columns...

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Calculation of Pier Cap with tapper area?

0 Answers  


volume of 2 bulbs in pile of height 10' diameter 1'3''

0 Answers  


formula of calculation of weight of steel bars

15 Answers  


What is the biggest dam in america?

0 Answers  


Isolated square footing quantity calculations

2 Answers  


how to calculate mivan shuttering matrial

0 Answers  


Cement coefficient used for Solid and hollow concrete blocks

1 Answers   DCB,


What is the Laplenth for Reinforcement for Verticl and horizontal Structures as per IS code?

7 Answers  


Why you are leaving present job?

0 Answers   HCL, L&T, NCC,


how to design and calculate materail quantity for concrete speedbreaker ?

0 Answers  


A floor has to be removed partially with block work tying floors together, can block work continue on floor that has to removed excluding demolishing works tying floor from underside of slab and top of slab demolishing floor upon completion?

1 Answers  


HOW TO DETERMINE FOUNDATION DEPTH OF A MULTYSTORIED BUILDING. IS THERE ANY OTHER FORMULA EXCEPT RANKINE'S MINIMUM DEPTH FORMULA.

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)