what is the minium content of cementous material per cu
meter
Answers were Sorted based on User's Feedback
Answer / shridhar
The amount of cementitious mateiral is determined by amount
of portland cement plus amount of fly ash.The minimum
portland cement content should be 350 kg/m3 of concrete
| Is This Answer Correct ? | 1 Yes | 1 No |
how to calculate the number of cement bags required for 1m3 of work
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
how to find hardness of water?why it should be determined?
how to mack bbs
why main steel is to be reinforced in shorter direction in case of slab?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
Please tell me present is code no for steel structure work. Thanks.
what is tacheometry?
what is stub column ?
how to take concrete quantity for precast segment for viaduct project?
What is BOQ why to calculate BOQ
one cubic meter of concrete contains how much proportions of cement,sand and course aggregate
6 Answers AB Inc, APPSC, Arif Builders, Ramky, SMEC,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)