what is the minium content of cementous material per cu
meter
Answers were Sorted based on User's Feedback
Answer / shridhar
The amount of cementitious mateiral is determined by amount
of portland cement plus amount of fly ash.The minimum
portland cement content should be 350 kg/m3 of concrete
Is This Answer Correct ? | 1 Yes | 1 No |
How many bricks,sand,cement in 1m3 bricks masonary
how to prepare site mix design
how to convert udl into point load??
for brickmasonry strengthwise which bond is better?
how to convert sand from Cum to Brass
what the length we reduce for 45deg. bend for each side bend of bar.we know the 2d in case of 90 deg. bend.give clarification also?
What is meant by cad?
what are all the new civil construction materials?what are the new concepts ?
How manu days after the casting of a slab another slab can be casted above it? what is the total curing time of a slab if ponding is not done on it?
I've beams dimensions of 9"x 18"x 45' please calculate the weight. Thanks
2 Answers SRR Properties, Student, Treetop Solutions,
Please let me know the quantity of steel required for 2600 square feet 6" thick roof slab of the house?
pile load testing procedure