what is the minium content of cementous material per cu
meter
Answers were Sorted based on User's Feedback
Answer / shridhar
The amount of cementitious mateiral is determined by amount
of portland cement plus amount of fly ash.The minimum
portland cement content should be 350 kg/m3 of concrete
| Is This Answer Correct ? | 1 Yes | 1 No |
Please send the graphical comparision Viscosity vs temp. for Penetration grade, Viscosity grade & CRMB.
how much minimum steel provide in column
what is the bearing capacity of hard rock
How to do bbs in excel format
what is weight ratio for concerete grades M5 to M40
why we are placing the beam under the plinth wall?
explain kn/sqm in detail.
what energized you to complete your course?
What is the diameter of the 3"inch nails?
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
What is meant by dimensioning?
How can you achieve soil enforcement?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)