Answer / arjun
Design Mix Proportion includes cement, sand, aggregate,
water and admixtures for getting high compressive strength
of concrete with suitable proportions. generally in
different locations the properties of these materials is
different so aviod the genaralproportion like 1:2:4 or
1:1.5:3 various samples are taken randomly upto getting
good results mix design can be done.
design mix normally used in all works like Mass Concreting,
Concrete PAvements & Bridges, Dams, Flyovers and huge
structures
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / santosh singh
design mix is done to achieve higher strength of cement ie
over m25 grade.they are used for dams, skyscrapers,mass
construction etc
| Is This Answer Correct ? | 3 Yes | 3 No |
Answer / rajesh bhowmick
For Design Mix there is no proportion. Volume mix does. We have to calculate the weight of the cement, fine and coarse aggregate to achieve the target strength.
| Is This Answer Correct ? | 0 Yes | 0 No |
Design mix proportion is the proportion of concrete ingredients i.e. cement, sand,aggregate and water which is designed by trying different combinations of ingredients so as to achieve higher strength with economical design.
| Is This Answer Correct ? | 0 Yes | 0 No |
what is the least count of auto level staff
What are the types of Road in India?
how i convert mm into standard wire guage (SWG)no.
What is the significance of cost estimate knowledge for an architect?
if the slab is 2 way then,where we will put lapping upper and lower side?means near to beam or center and near to center?
Project at andheri west mumbai total area of 116000 sq ft near by..Please help me out for quotation plan is ready basic details are with me , please help me out .I will mail u in autocad also.
which type of materials should be used for framed structure???
what is the difference between sill beam,Tie beam and plinth beam?
Describe why concrete must be compacted after it is poured?
What is the permissible limit of silt contain in sand for rcc Work?
Why should appointment store person for project ? what is the benefits for company ?
what is the service corridor?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)