Ratio of cement : sand for fixing slab and tiles in the
floor and also quantity of cement and sand requires for
laying slab and tiles separately (area 100 sq. ft)
Answer / md. mainul islam
Ratio=1:4
Cement:1.5 Bag
Sand: 7.5 cft
Is This Answer Correct ? | 0 Yes | 0 No |
How To do Steel Design of Beam,Columm,Slab,Staircase,Wall?
Steel calculation formala for column,beam and slab.
Middle point of any slab is raised 10-12 mm during shuttering work because––
Why do we provide development length in RCC?
How can we calculate the cement Quantity in M25?
2 Answers JK Associates, Vardhman, Wave Infratech,
how to calculate amount of materials for concreting and plastering?
what will be the quantity of following materials in P.C.C for the total area of (100'x70'x 0'4") 1)NO. OF CEMENT BAGS 2)SAND IN CU.FT 3)METTLE IN CU.FT
0 Answers Pratibha Industries,
Direct chairs over shutter / beside earth is prohibited because of ––
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
What is the ratio of cement ,sand, and aggregate to be used in M20 grade of concrete when excavating 200 x 200 x 200 mm of sand from soil
What is Rodding?
why the horizontal crack occoured in the joint between brick work and lintel?pls. give clarification???