m25 water cement ratio calculation
Answer / ghouse rabbani
As per IS
10262-1987 water
content required
for m20 for one
cum is 186 kgs
| Is This Answer Correct ? | 2 Yes | 0 No |
how to calculate the wind pressure
In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment
Why are pull-out tests performed for soil nails?
What is the cemnent ratio
M25calculate of formula which in kg cement of 1cum
how to laying tarfelt on asbestos roof for leeks water?
Define What is aggregate?
can u plz send me ntpc placement papers(civil engineering) at munjalricha1988@gmail.com and which types of questions are aked by ntpc
In beam where lapping is allowed for top and bottom bars?
1 Answers IOCL, JMC, JMC Projects,
what happened if the diameter of capillary tube is double then the capillary rise will be
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
how we decide the thickness of slab
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)