how the centre of gravity is used in construction?
Answer / shivamm shukla
If any beam which is in full length,the full length of any
beam$ 2/3 part,we used to the centre of gravity.
| Is This Answer Correct ? | 10 Yes | 0 No |
in one SQM plaster how much Cement and sand consumed in ratio 1:4
What are the advantages of cad software’s?
what is the standard brick frog size ?
what are some possible sources of error in the CBR test?
how to calculate the required qantities of cement, Sand and aggrigate to prepare 1 Cum of concrete mix 1:2:4
How can you achieve soil enforcement?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
What is Shoe Footing ?
2 Answers Bhandari Associates,
is their any instrument which can detect steel after casting of slab,etc. for verification of steel in slab,etc.
What is Refuse Area In High Rise Building ?
what is the difference between stress and pressure??
what is the meaning of M & 20
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)