how to estimate shuttering form work or how to take off material quantity???
Answers were Sorted based on User's Feedback
Answer / bharat raygor
shuttering area : perimeter length*height
| Is This Answer Correct ? | 1 Yes | 1 No |
to estimate shuttering form work for 1 cum of concrete 5 to 6 sqm of shuttering material required, calculate the concrete in cubic meter than multiply by 5.5 .
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / prem
work out for RCC quantity in cu.m .multipy that figure with 4 . you get shuttering quantity
| Is This Answer Correct ? | 1 Yes | 4 No |
what is a minimum strength recommented for aerocon blocks?
How do piles bear loads
How to check percentage of bulkage of sand in RCC?
DESIGN PROCEDURES OF R.C.C ELEMENTS
procedure for preliminary selection of size of column of 5 storey building
What is the diameter of the 3"inch nails?
What is the minimum depth of a slab?
how to calculate reinforcment in staircase cranked beam?
what is the difference between built-up area & carpet area? how to calculate this areas?as there are any formula to calculate these areas?
Where is the worlds longest elevator and how long is it?
What is specific gravity???
how to calculate weight of round steel bar and square steel bar, i section bar and c channel bar, angle bar
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)