how to estimate shuttering form work or how to take off material quantity???
Answers were Sorted based on User's Feedback
Answer / bharat raygor
shuttering area : perimeter length*height
Is This Answer Correct ? | 1 Yes | 1 No |
to estimate shuttering form work for 1 cum of concrete 5 to 6 sqm of shuttering material required, calculate the concrete in cubic meter than multiply by 5.5 .
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / prem
work out for RCC quantity in cu.m .multipy that figure with 4 . you get shuttering quantity
Is This Answer Correct ? | 1 Yes | 4 No |
what is the mean of opc cement and conceret grade 53 n?please explane with detail>
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
0 Answers Suraj Constructions,
if column length is 12'(feet) then how to take ring bar on it?
What is the difference between 53 grade and 43 grade cement
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
what is the formula to calculate isolated footing
what is the price of a cubic meter of concrete on international market?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
what is labour consume factor in residential projects
sir my site not availabele 12mm steel now if i use 10 mm how many spacing require for slab design slab thk 200mm footing, column,raft,wall how can calculate give me formula
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
which tests for concrete pouring period at the site?