how to estimate shuttering form work or how to take off material quantity???
Answer Posted / prem
work out for RCC quantity in cu.m .multipy that figure with 4 . you get shuttering quantity
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
Wat is meant by Aecron brick?
what radial pressure, the NP2 class rcc pipe can sustain?
Use of coping on terrace wall and in 4" wall is compulsory or not ?
What is the Null Point of chimney in Power Plant
How many Sft of Level Plaster per Kg
What is meant by Crystal Concrete?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
trapozidal
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
Define mirror?
How much does the leaning tower of pisa lean?
what is the difference between natural draught cooling tower and induced draught cooling tower