how to estimate shuttering form work or how to take off material quantity???
Answer Posted / prem
work out for RCC quantity in cu.m .multipy that figure with 4 . you get shuttering quantity
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
How to come 1.54 from dry to wet concrete?
What will you do if you encounter problems like accidents?
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
what is raft foundation
What is the difference between routing maintenance and major maintenance in school facilities?
What are the materials used in building a gravity dam?
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
how to preaper for interview wat they asked in interview give me idea
If specific gravity of cement is less than 3.15 what is the cause?
What is the difference between built area and super built up area?
3. What are the disadvantages of your present job, things you do not like about it?
How much quantity water should be placed in one cubic meter area?
What is Heavy Concrete & Normal Concrete