how to estimate shuttering form work or how to take off material quantity???

Answer Posted / prem

work out for RCC quantity in cu.m .multipy that figure with 4 . you get shuttering quantity

Is This Answer Correct ?    1 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is density of 20mm coarse aggregate.plz send answer my below adress e.mail

1633


how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour

1099


Explain the difference between slab and beam?

678


in design case of structural member best suitrable percentage of steel limit is what

1070


in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?

1856






Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

2244


How much percentage of brick bats allowed in CD-75 bricks

1893


Can we apply curing compound on ceiling (slab Bottom)

370


I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.

1530


what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same

1722


I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help

2325


what is parametre for M25 after 7 days strength

1532


how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you

2132


Why Is Propping Required For Long Structures Once The Form Work Is Removed?

704


what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?

1756