how to estimate shuttering form work or how to take off material quantity???
Answer Posted / honnikery-007
to estimate shuttering form work for 1 cum of concrete 5 to 6 sqm of shuttering material required, calculate the concrete in cubic meter than multiply by 5.5 .
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
what is the calculation of raw material for 0.35cum of m-15
What is the release of lien?
detailed calculation of the amount of cement used?
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
Formula of area of crane hook
define the strength
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
Differentiate orthographic and isometric projections?
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
What is the significance of cost estimate knowledge for an architect?
What materials were used to build the golden gate bridge?
what pressure the NP2 class RCC pipe can sustain?