how to estimate shuttering form work or how to take off material quantity???
Answer Posted / honnikery-007
to estimate shuttering form work for 1 cum of concrete 5 to 6 sqm of shuttering material required, calculate the concrete in cubic meter than multiply by 5.5 .
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
How did the romans get water up hills using aqua ducts?
Draw the cross section of a boundary wall and label its part with detailing?
reinforcement slab, beam and column formulas?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
what is the painting co efficient of slope roof tiles?
how to calculate steel for slab or footings?
what discoveries did you have in relation to your course?
How much of the strength of concrete comes from post- production curing?
what is constat for brickwork
What are the advantages of building a dam on the river nile?
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
what is conrete grade ,how are depent on concrete grad and size of concrete?
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
acceptance criteria for concrete works