how to estimate shuttering form work or how to take off material quantity???
Answer Posted / honnikery-007
to estimate shuttering form work for 1 cum of concrete 5 to 6 sqm of shuttering material required, calculate the concrete in cubic meter than multiply by 5.5 .
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
What is the exception critarea of cube?
what is the mix design for M:60 with micro silica andmetakaoline?
HOw much % of premium on DSR-2013 currently
What are the strongest shapes in building?
How to calculate canal slope curvature qty!
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
sir please send me campus placement questions in civil engineering
Critical Path Method is...
why we are using stub column..? is it possible to construct steel stub column..?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
how can we construct building without foundation providing only grade beam at ground level
What are the uses of alloys in daily life and how are alloys made?
what is kribs is supporting?
what is labour consume factor in residential projects
explain five benefits of using standard terminology in the measurement process?