how to estimate shuttering form work or how to take off material quantity???
Answer Posted / bharat raygor
shuttering area : perimeter length*height
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What is the average density of soil?
why we use 19x9x9and 20x10x10 but not other
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
what is the design procedure for building
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
what is the max. area can we apply the plate load test ?
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?