How to check percentage of bulkage of sand in RCC?

Answers were Sorted based on User's Feedback



How to check percentage of bulkage of sand in RCC?..

Answer / mahendra mohan srivastava

first we can weight sample of sand then we can take it to
SSd condition then we calculate moisture and if moisture is
6 % then bulkage will 30 % so we can put 6% less water and
30% execss sand after correction.if moisture will exess to
6 % then we will take less water equal to moisture and sand
will not exceed.

Is This Answer Correct ?    29 Yes 18 No

How to check percentage of bulkage of sand in RCC?..

Answer / rojas james

Bulkage of sand is used to determine the change in volume of sand when doing volume batching, when moisture is there in sand upto a limit the volume will increase then after saturation the volume will decrease so in volume batching if sand is having moisture the volume will be shown high than the actual and it can make the mix to segregation due to less Fine Aggregates

Is This Answer Correct ?    3 Yes 0 No

How to check percentage of bulkage of sand in RCC?..

Answer / suresh

this is not answer.
my question ... first we check and give moisture correction.
this is ok. in that same time why we have required of
bulkage of sand..?

bulkage of sand: we have using only volumetric based place
not in weighement location.

Is This Answer Correct ?    7 Yes 6 No

How to check percentage of bulkage of sand in RCC?..

Answer / sai

By proctor test we can find dry density,and water content by any mtd like cal. Carbide then by using formula we can find bulk density

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

plz tell me max persantage of sand for every mix design by volume or weight.

3 Answers   L&T,


what is general scouring?

5 Answers  


steel which is used for reinforcement and structures why they are directly used why GALVANISATION or PRIMER is not done to prevent from corrosion

1 Answers   ITD, L&T,


what is the cover used for footings, columns, beams ??? why they differ & how they arrive??

4 Answers   GK Realtors,


which type of cement is used for RCC construction?Why?

4 Answers  






how we can calculate the capacity of a proposed canal in a command area.

5 Answers   KPL, MPPSC Madhya Pradesh Public Service Commission,


what is civil enginnering & what you need of this course?

0 Answers   L&T,


what is chicken mesh?explain its use

5 Answers  


what is floating slab foundation?

0 Answers  


what is differences between ferrock and concrete ?

0 Answers  


1:4:8 pcc calculation 591 cu.ft

0 Answers  


Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)