how to convert m 25 concrete to m 40?

Answers were Sorted based on User's Feedback



how to convert m 25 concrete to m 40?..

Answer / sjtbehera

what is the meaning of the question. basically m 40 are
desigin in weigh basis i.e desigin mix.

desigin of m25 is separate from m40 desgin. that is not a
conversion method. if you make m40 you add aditional weight
of material with m25 material.

Is This Answer Correct ?    13 Yes 0 No

how to convert m 25 concrete to m 40?..

Answer / guddu kumar singh

By quality controlling
and use modern mixing
method

Is This Answer Correct ?    0 Yes 0 No

how to convert m 25 concrete to m 40?..

Answer / t.madhu sudhan

By trial n error method at lab with respect to available cement, course aggregate and fine aggregate, we achieve required strength of a cube, is known as mix design, where as nominal design is taken upto M20 grade concrete to a total 1 M3, to a total quantity of about 1.51 M3 divided by their mixed proportion s

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

How to calculate Rate of 10 cum of Brick masonary,if the rate of material are as fallow? sand=Rs.500/mt Brick=Rs.5/brick Labour=Rs 300/day Free issue=cement+water+electicity.

2 Answers  


how many blocks required for 100sqft 8" blocks

2 Answers   NCC,


Is there any possibility of changing in dia of bar from lower to higher (i.e Lower dia bar at bottom and Higher dia bar at top)

3 Answers  


What is the difference between routing maintenance and major maintenance in school facilities?

0 Answers  


10 sqr in room reinforce concret so athu evvalavu wait thankum , atha eppati calculate panrathu

0 Answers  






in 1:2:4 concrete, spcify 1,2 and4 as towhat they indicate?

2 Answers  


appsc AEE'S interview questions wanted

3 Answers   APPSC,


how to calculate unit weight cement ,water ,steel

2 Answers   L&T, SVS,


what type of cement are used for fixing of tiles at floor/wall

4 Answers   IVRCL,


sir, how to calculate steel per 1 m2

1 Answers  


is basic cost of the material includes tax?

0 Answers  


The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)