Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the slump of pile concreting work? give me the value
of minimum and maximum value of slump and how give slump in
pile?

Answers were Sorted based on User's Feedback



what is the slump of pile concreting work? give me the value of minimum and maximum value of slump ..

Answer / gouda_civil33

minimum 100mm maximum 200 mm

Is This Answer Correct ?    6 Yes 0 No

what is the slump of pile concreting work? give me the value of minimum and maximum value of slump ..

Answer / senthil kumar

140mmto180mm slump
alloved for pile
concreate

Is This Answer Correct ?    6 Yes 0 No

what is the slump of pile concreting work? give me the value of minimum and maximum value of slump ..

Answer / englitu

The slump for pile, we use generally, is around 6 inches. The last part of your question, that is "how give slump in pile", is not clear to me.

Is This Answer Correct ?    2 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

What are the Noms/8hr for Concrete Work for Mason,Carpenter,Steel Fixer

2 Answers  


difference between nominal mix and design mix difference between nominal size and actual size of brick,aggregate etc

1 Answers   L&T,


why crakes are developped in opening corners

3 Answers  


Describe the sections included in a typical bill of quantities

0 Answers  


how to calculate Tile skirting

5 Answers   JMC Projects,


What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m

0 Answers  


Why I-section is preferred to channel section?

7 Answers   Engineers India,


how to calculate the scour depth

0 Answers  


how do you estimate the # of bags of cement, sand & gravel.. if only given the volume of the project..

3 Answers  


how much dry volume of cement in 1cum in m20 grade

3 Answers  


Key is put at the time of casting 1st lift of column to get– –

1 Answers  


which is code used for ppc cement

5 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)