How to calcuate the quantity of cement,sand for plastering 1:4 12mm thick?
Answer / nikita khanadre
Volume of plaster=1m*1m*0.012m=0.012cum
Dry volume=0.012*1.33=0.01596cum
Cement =1/(1+4) *0.01596=0.003192cum/0.035=0.0912 bag
Sand=4/(1+4)*0.01596=0.012768cum
| Is This Answer Correct ? | 2 Yes | 0 No |
how to calculate testing date
Is there any difference in IS 456 and IRC 15?
what is the difference between onw way slab & two way slab?
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
0 Answers College School Exams Tests,
what do you mean by punching shear?
what is the praposion of M30 concrete mix.
what is main diffrence between vitrified and cremic tile????
2 Answers Colliers International,
How many kilograms of sand required in cufic feet for one cubic meter of M25 grade concrete
how to calculate concrete quantity from its density or details mentioned in rmc batch report.
Explain the different types of building contracts?
What kind of tests will conduct in plastering
what is project planning
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)