what type of drawing used in the field construction?
Answers were Sorted based on User's Feedback
Answer / swappatil_2007
use GFC (good for construction)drawings only.
| Is This Answer Correct ? | 77 Yes | 3 No |
Answer / said moqeem
for one structur we can use below drawings:
Structural,architectural,mechanical,electrical,plumbing and
civil drawings
| Is This Answer Correct ? | 29 Yes | 3 No |
Drawing that is subject to good for construction ( GFC
Drawing ).
| Is This Answer Correct ? | 13 Yes | 2 No |
Answer / mustafa
U Can us only two Responsible & main Person
1) Architectural Drawing With (GFC) stamps & approval
2) Structural Engineers With (GFC)& stamps
| Is This Answer Correct ? | 9 Yes | 1 No |
Answer / selvakumarkknpp
Geomenty & Reinforcement Drawing are used.
| Is This Answer Correct ? | 7 Yes | 2 No |
Answer / chandrakantha
Used construction field preliminary drawing
| Is This Answer Correct ? | 3 Yes | 1 No |
how to start basic designing in structure..procedure to knw basic start to do structural designs in civil field?
how calucate cement sand ratio for plstering
WHAT HAPPEN WHEN USING OF LARGEST POSSIBLE MAXIMUM SIZE AGGREGATE RATHER THAN SMALLER AGGREGATE IN RCC ?
whats are the max value of providing of super-elevation in road way in various condition?
what is the most suitable foundation when construct a bird watching tower in a marshy land
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
when we select buildup beam
Formula for calculation volume of essentric footing
for preparing 10cum of 1:4:8 cement concrete the requirement of sand is 0.7cum 2.8cum 4.74cum 18.40cum & how
what"s the sort of beams?
Whats the size cube
2 Answers Shimla Hills Construction,
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)