4. What is your philosophy / attitude towards work?
Answers were Sorted based on User's Feedback
Answer / ratan
be perfect & try to manage every thing within the time.
Is This Answer Correct ? | 7 Yes | 2 No |
Answer / bala
* Safety first.
* Never to say i know, for what i really dont know.
* Never to do a mistake or giving green sign to a wrong
work which i am very much aware of.
* Doubt, clear first
* Every thing should be 100 percent.
Is This Answer Correct ? | 7 Yes | 2 No |
Answer / ramana
Our work is more fast, efficiency than the others .
Is This Answer Correct ? | 3 Yes | 3 No |
Answer / lavanya
normally not getting bored of works which we handle.this
makes time efficient and work to be interesting
Is This Answer Correct ? | 1 Yes | 1 No |
how much quantity of steel required for 1sqmt area?
4 Answers Jade Software, Samsung,
how will remove spiderweb cracking in plaster ? what the reasone of make it ?
How to find beam R/F cutting length
how do you stabilize a waterlogged area in road construction
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
how to calculate sand, aggregate and cement in m25 concrete?
2 Answers CCL Products, Western Infrastructure,
Give list of building construction equipment & explain about them in brief. How much is fuel consumption of JCB, DUMPER, POCLAIN, TRANSIT MIXER?
How to calculate compressive strength of concrete?
how to calculate the no of cement bags required for 100sqft of area 12 mm thick plastering in proportion of 1:3,1:4,1:5,1:6?
What is a MIS report?
how much cost of single coat 20mm thick plastering per sqre meter
What is the cemnent ratio