What is the veriplus for ellips card length formula (major axis
3.4m,minar axis 2.6m spacing 0.2m
No Answer is Posted For this Question
Be the First to Post Answer
What is the Compressive strength of concrete C40/20 at 7days
What is the difference between Wraft and file foundation and where these are used ?
what will be the grade for M 30 ,35,40,45,50,55???
what is the minium content of cementous material per cu meter
Please tell me about building work from begining
how much of the strength comes from post-production curing
What is the capacity of Maharashtra in power generation by winds?
5 Answers MPSC, State Bank Of India SBI,
From which end do you start deshuttering in a) cantilever portion b) simply supported portion
What is difference between FE-415 and FE-500???
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
why & what is perchatage we are using fly ash in concrete?
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)