what is workability,define it?
Answer / anon
Workability is the ease with which concrete can be handled
| Is This Answer Correct ? | 1 Yes | 0 No |
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
wha is frog?
what is the defination of an ideal fluid?
What are the disadvantages while using stone dust as filler in pavements?
What's the expanded form for NMR?
A ground is nonengginered fill 15 years back; how we can find the level of consolidation and bearing capacity
Are you ready to relocate with your immediate family to United States as a new employee?
While Calculating Quantity Of cement,sand,Metal we get cement in no of bags,Where Sand & Metal we get in Meter Cube(M3)how to convert it to Units(i.e in no of lorry's or Tractors )
Compressive strength of concrete
5 Answers B L Kashyap, Era Infra Engineering,
How to calculate the sand and aggregate in concrete
hi , can anybody help me about the following doubt...... what is the difference between clear cover, cover and nominal cover to reinforcement ?
quantity of cement required for M35 grade reinforced cement concrete
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)