Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What should be the required steel in column, beam and slab



What should be the required steel in column, beam and slab..

Answer / manikandan

Columns -150 kg/m3
Beams - 125 kg/m3
Slab 75kg/m3

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

How we decide the type of footing?

1 Answers   Civil World,


2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;

1 Answers   TCS,


wat is diff. between rectangle & parallelogram?

4 Answers  


factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard

0 Answers  


why we provide plastic sheet under lean concrete/pcc.?

2 Answers  


details of steeel

2 Answers   NCC,


What is the finess modulus of sand?

19 Answers  


mix design of concrete using indian standard methods

10 Answers   CCCL,


how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?

0 Answers   ABC, L&T,


what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?

0 Answers  


Sir what reason the deshuttring of column 1 day after casting and slab deshuttring time 14 days after casting 

1 Answers   Saudi Oger,


Write down a formula to calculate the number of 50Kg bags of cement for moulding of cement blocks of tcm thick by 20cm high by 40cm long on site with a mix ratio of 1 bag of cement to 3 wheelbarrows of sand . the sand is measured at a STRUCK( WATER LEVEL) 65 litres capacity wheelbarrow. TEL: +237 674630019

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)