what is Tsunami. explain it's formation.
Answers were Sorted based on User's Feedback
Answer / pappan
Tsunami is gain waves generated in sea due to offshore
earthquakes
| Is This Answer Correct ? | 19 Yes | 4 No |
Answer / raghu
i think, movving continental plates when collided with each
other gives raise to energy waves known as sunami
| Is This Answer Correct ? | 10 Yes | 6 No |
Answer / parminter singh
sunami is disturbance under the sea of waves by the
earthquake .
| Is This Answer Correct ? | 3 Yes | 3 No |
Answer / ramana
TSUNAMI IS THE HUGE WAVE GENERATED BY EARTHQUAKE IN BOTTOM
SURFACE OF SEA
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ganesh
Tsunami is a natural disaster which is occurred typically in ocean. It is formed due to the moment of tectonic plates present in the ocean and also due to explosion of lava beneath the ground surface. When if this type of things are done in the sea then due to the pressure formed at that place lead to formation of larger waves that waves we called as tsunami
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / kodeeswaran
it is a wave train, or series of waves, generated in a body of water by an impulsive disturbance that vertically displaces the water column. Earthquakes, landslides, volcanic eruptions, explosions, and even the impact of cosmic bodies, such as meteorites, can generate tsunamis
| Is This Answer Correct ? | 4 Yes | 5 No |
Answer / debabrata roy
tsunami is a series of water waves caused by the
displacement of a large volume of a body of water, such as
an ocean. it is japanee word means "harbor wave".
| Is This Answer Correct ? | 1 Yes | 4 No |
List out the densities of different construction materials such as brick, steel, sand, aggregate etc...
why crakes are developped in opening corners
what is the difference between replacement of cement by groundnut shell ash
What type of foundation preferred in sandy soil ?
1) one brass of stone aggregate 20mm is good for how much sq.ft. work of concrete beam and 2) one brass of river sand is good for how much sq.ft. work of concrete beam . if ration is 1:4:6. at the same time how many bags of cement will be required for same work if each bag is of 50 kgs . please help me.
How many different between estimated quantity and practical work at site.
where can i get the previous question papers for rrb section enginerr (civil)
How manu days after the casting of a slab another slab can be casted above it? what is the total curing time of a slab if ponding is not done on it?
For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?
why +1 to be followed for calculating the no of bars in BBS. Please explain
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
What is the force exerted by the tacoma narrows bridge?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)