distinguish between under reinforced and over reinforced
beams?
Answers were Sorted based on User's Feedback
When the maximum stresses in steel and concrete
simultaniously reaches allowable value the section is
called balanced section
when the %of steel in a section is less than that
required for a balanced section it is under reinforced
section
when the %of steel in a section is more than that
required for a balanced section it is over reinforced
section
Is This Answer Correct ? | 45 Yes | 3 No |
Answer / s.venkatesh naik
over reinforcement is as per section design I.e Ast1+Ast2>Ast
Ast1+Ast2<Ast it is under reinforced section
conclussion is : Total area of steel is less than the designed one it is under reinforced section
Total area of steel is over than the designed one it is over reinforced section
Is This Answer Correct ? | 22 Yes | 8 No |
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
what is super elevation?
what is the productivity in aluminium shuttering per day
quantity of material needed for rubble stone masonry for 1:4 and 1:6
explain about earth quake zones? Chennai falls under which zone
what is pile cap and why its used ??? why its provided in different shape
Respected Sir, I am from a hilly place called Darjeeling ,I have constructed house of 9 column out of which 4 of the column is under water , i have put rcc slab on top and on top of the rcc slab i have construced two room house with bricks and light roof , now i am planning to change the light roof with rcc slab for the two room, my main concern is will the column under water will hold the load of the new rcc slab coz it already 10 to 12 yrs old , i dont know what to do , can u advice me regarding this matter, weather to leave the upper floor roof light or make it rcc slab.(If i put the slab , it will require 45bags of cement and u calculate how much of steel and sand and pebbles) thanks with regard Anand
Which are the top apps for you civil engineering?
how to find no bar in 1 length
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
what is daily progress of a steel fixer average how many kilograms he can fix in 8 hours average
1 Answers Al Latifia Trading Contracting,
i need the how much materials are needed for cubic feet of concrete?