why we used primmer in plumbing pipe???
and also what is SCH 80 AND SCH 40
Answer / yash rana
Now days gi pipes are used which are already galvanized and they cannot be resisted by corrosion
Is This Answer Correct ? | 0 Yes | 0 No |
what is the allowable limit of wastage of cement for RMC at plant operated manualy
how much quantity of work we can get by rod benders per day
what is ment by surveying?
What is BOQ why to calculate BOQ
Which is the latest version of solidsworks?
what is the difference between TOR & TMT
what is shear key and steel schedule?
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..
to minimize budget cost of building , what can i do
how to identify different types of soils in field?
what is rolling margin of steel