providing, fixing, removal of pockets of size 100*150*300mm to 500*600*1000mm for foundation. the shuttering material used for making &fixing of pockets shall be removed by the contractor without damaged to pockets. if any damage occurred, the same shall be rectified by the contractor is to handover the pockets to forge shop engineer with proper marking of centre lines, levels etc.
what could be the production cost of 1 cum of concrete by CP30 plant
What is the usage of zoom command?
how much M-25 steel reinforcement per cubic meter in commercial building as per IS code
I what know about life time of frp tank plz explain about it specifications & other details
While Calculating Quantity Of cement,sand,Metal we get cement in no of bags,Where Sand & Metal we get in Meter Cube(M3)how to convert it to Units(i.e in no of lorry's or Tractors )
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
whats are the max value of providing of super-elevation in road way in various condition?
Anyone have sample questions for bhel please send me since Iam appearing for this exam. Kindly send this to my e-mail: nethaj_babu@yahoo.co.in
what do you mean by ssd how it calculated
What are the common ways of demolition?
how many express way in india
WHAT TYPE OF MATERIALS (CHEMICALS) ADDED IN CONCRETE TO INCREASE THE STRENGTH OF CONCRETE?