If load of the structure is not huge enough and need not a deep foundation but the quality of soil also not very good in a shallow depth then we go for raft foundation. Where the load is quite high and need a good bearing capacity then we go for pile foundation.
Is This Answer Correct ? | 5 Yes | 0 No |
Answer / asif
Raft Foundation
1.Raft foundation is shallow foundation ( depth is less than width )
2.commonly used high rised buildings
3.Suitable for low & High bearing capacity of soil
4.Load is spread large area in uniform way
5 Advantage of different settlement of soil
Pile Foundation
1.Pile foundation is deep foundation ( Depth is more than depth)
2.Normally used coastal area's
3.It is used low bearing capacity (it transfer load into hard soil or rock in loose soil area)
4.Piles are used anchor structure against uplift load
Is This Answer Correct ? | 0 Yes | 0 No |
1m3 of brick is equal to how many cft of brick
what is the initial setting time & maximum duration concrete get hardening for ordinary portland cement?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
what is civil engineering?
2 Answers CPWD, drda, Jal Nigam, NHPC, Uttar Pradesh Jal Nigam,
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
why are you joining in this (applied post) job and your aim for this job
how many bags of cement are needed to make a cement mortar of 1:3
5 Answers ABC, DBL, DHFL Dewan Housing Finance Corporation, VV, WADAN,
how do you calaculate the total steel quantity of an rcc building using thumb rule?
how amny bricks of size 240 mm X 120 mm X70 mm are required in 100 cubic meter brickwork. How much cement is required at 10 mm masonry and at 4:1 sand cement ratio and how much cubic meter of sand is required for the above work.
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
what are the types of roads?what are the types of highway?
what is normally consolidated clay and over consolidated clay?