Answer / bethina sudheer
civil engineering is branch that deals with constucrtion.
and we cant do anything without civil engineer. All
engineering branches deals with civil enginnering
| Is This Answer Correct ? | 8 Yes | 4 No |
Answer / m. jahir hussain
TOTAL VOLUME
1000 X 4" = 330Cubfeet
330/35.28 = 9.35 cubmeter
SLAB CONCRETE RATIO 1:2:4
1.57/7 = 0.2242
0.2242 X 1440 =323 KG CEMENT/M3
BAG IS 6.45 BAG OR 6.5 BAGS/M3
OUR SLAB VOLUME IS 9.35M3
9.35 X 6.5 = 60.775 BAGS OR 61 BAGS
| Is This Answer Correct ? | 8 Yes | 9 No |
Time required for curing of wall tiles before fixing
how many shuttering material required for 1000 sq.m built up area.
difference between deep and shallow well?
1M2=how much M3?
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
1 Answers ECR, RRB, Si Precision Moulds,
if column length is 12'(feet) then how to take ring bar on it?
.want to know the volume of water for 1.2.4 concert mixing ratio
for gravel roads in India to get 1feet height how much height we have to fill
trapozidal
In cement making,what is meaning of blend,fineness,density.
how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculation
34 Answers Call Centre, CCCL, Oracle, RLM, RPP, Sunanda Infra, Sunrise Enterprises,
how to find the carpenter work per day? how many cubic feet they should be work per day?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)