what is civil engineering?
Answers were Sorted based on User's Feedback
Answer / bethina sudheer
civil engineering is branch that deals with constucrtion.
and we cant do anything without civil engineer. All
engineering branches deals with civil enginnering
| Is This Answer Correct ? | 8 Yes | 4 No |
Answer / m. jahir hussain
TOTAL VOLUME
1000 X 4" = 330Cubfeet
330/35.28 = 9.35 cubmeter
SLAB CONCRETE RATIO 1:2:4
1.57/7 = 0.2242
0.2242 X 1440 =323 KG CEMENT/M3
BAG IS 6.45 BAG OR 6.5 BAGS/M3
OUR SLAB VOLUME IS 9.35M3
9.35 X 6.5 = 60.775 BAGS OR 61 BAGS
| Is This Answer Correct ? | 8 Yes | 9 No |
how to calculate ractangular water tank capicity
3 Answers Gokhale Constructions,
the plan area of a building 10*15 of superstructure 0.30 then plinth area is
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
can any body tell me that we stdy different grades of concrete $ their strength . as we knot the strength of conrete that this grade or ratio of concrete has this much strength ? even that we go for labortory test what is reason behind that?
What are the advantages of cad software’s?
how many shuttering material required for 1000 sq.m built up area.
What is the dimension of Slump cone which is used to measure the Slump value of concrete? Slump value for Pile concrete? Slab concrete? Column concrete?
What is the Maximum & Minimum size of rod using on the column?
Form where IS456 is adopted in 1978?
What is reinforced brick masonary and its advantages and applications, arrangement of steel
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
why we are condecting the slump test for concrete?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)