Answer / bethina sudheer
civil engineering is branch that deals with constucrtion.
and we cant do anything without civil engineer. All
engineering branches deals with civil enginnering
Is This Answer Correct ? | 8 Yes | 4 No |
Answer / m. jahir hussain
TOTAL VOLUME
1000 X 4" = 330Cubfeet
330/35.28 = 9.35 cubmeter
SLAB CONCRETE RATIO 1:2:4
1.57/7 = 0.2242
0.2242 X 1440 =323 KG CEMENT/M3
BAG IS 6.45 BAG OR 6.5 BAGS/M3
OUR SLAB VOLUME IS 9.35M3
9.35 X 6.5 = 60.775 BAGS OR 61 BAGS
Is This Answer Correct ? | 8 Yes | 9 No |
What materials were used to build the golden gate bridge?
what is difference between GTS bench mark and temporary bench mark
at the beam-column junction point tell me how much beam bars should pass through column ring ? 3 or 2 or 1 . answer with reason. if it is not happen then what will be he effect ?
how to calculate slab reinforcement c/c spacing bars and how calculate minuam slab basic slab & roof beams reinforcement design
how many litres of enamel paint required for 5000 sft of site??
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
curing of concrete why 7day's,14day's 21day's 28days
give me an example of finding depth of foundation
how much to get of BRC lapping in full yield and half yield ?
how calculate volume of bulb(rimmer) of pile
can u use instead of water milk for concreting
father of soil mechanics