what is the initial setting time & maximum duration concrete
get hardening for ordinary portland cement?
Answers were Sorted based on User's Feedback
Answer / karthik rajendren
The initial seting time for OPC is 30 mins and max time 10
hrs to become hard.
Is This Answer Correct ? | 24 Yes | 3 No |
Answer / sabari
The initial setting time of the cement should not be less
then 30mins,final setting time of the cement should not be
more than 10hrs
Is This Answer Correct ? | 10 Yes | 2 No |
Answer / ajaybir
initial setting time = 30 min
Maximum setting time = 600 minutes
Is This Answer Correct ? | 7 Yes | 0 No |
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
For M25 concrete ,what is the maximum compressive strength at 28 days ?
6 Answers L&T, Techno Builders,
if the nitrates more than 45mg/l in water lead to disease then what is it called
what is superbuilt-up area in flats & how it is calculate?
the min diameter of steel used in footing are
How many cement & sand require in 300 sq ft plaster 8mm thickness
1 Answers Kirthi Construction,
What is Bearing Capacity of Soil? How will you calculate for a particular type of Soil?
5 Answers Nagarjuna Construction,
how to calculate sand, aggregate and cement in m25 concrete?
2 Answers CCL Products, Western Infrastructure,
reinforcement slab, beam and column formulas?
Which type of question ask for written test for civil diploma trainee
what is the minimum compressive strength in 7 days for m20,m25,m30
Lap length may different for FE 415 and FE 500 Steel, If different what is the different, In which code is mentioned