what is the initial setting time & maximum duration concrete
get hardening for ordinary portland cement?
Answers were Sorted based on User's Feedback
Answer / karthik rajendren
The initial seting time for OPC is 30 mins and max time 10
hrs to become hard.
| Is This Answer Correct ? | 24 Yes | 3 No |
Answer / sabari
The initial setting time of the cement should not be less
then 30mins,final setting time of the cement should not be
more than 10hrs
| Is This Answer Correct ? | 10 Yes | 2 No |
Answer / ajaybir
initial setting time = 30 min
Maximum setting time = 600 minutes
| Is This Answer Correct ? | 7 Yes | 0 No |
230mm thick brick wall 10rmt length and 4.1 mtr high brick wall. tell quantity of cement,sand,brick required? Also tell me labour required to complete brickwall in 2days
What is IS Code ? And What is IS - 9301 ?
what is smart building materials?
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
How much binding wire required in 1 MT Reinforcement? How much Nails Required in 1 Sqmtr Area work progressed
What is the difference between face reinforcement and distribution bar in a concrete structure?
what are the standard & nominal size of brick
Where will be the maximum bending moment in a TEE Beam?
24. Why should we hire you?
parts of stair-case?
what is singly & doubly rc beam? what is difference between them?
how can change 10mm dia @275 c/c bar spacing to 12 mm
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)