Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the initial setting time & maximum duration concrete
get hardening for ordinary portland cement?

Answers were Sorted based on User's Feedback



what is the initial setting time & maximum duration concrete get hardening for ordinary portlan..

Answer / karthik rajendren

The initial seting time for OPC is 30 mins and max time 10
hrs to become hard.

Is This Answer Correct ?    24 Yes 3 No

what is the initial setting time & maximum duration concrete get hardening for ordinary portlan..

Answer / sabari

The initial setting time of the cement should not be less
then 30mins,final setting time of the cement should not be
more than 10hrs

Is This Answer Correct ?    10 Yes 2 No

what is the initial setting time & maximum duration concrete get hardening for ordinary portlan..

Answer / ajaybir

initial setting time = 30 min
Maximum setting time = 600 minutes

Is This Answer Correct ?    7 Yes 0 No

what is the initial setting time & maximum duration concrete get hardening for ordinary portlan..

Answer / deepak katyal

IST- 30 Minutes
FST- 600 Minutes

Is This Answer Correct ?    2 Yes 0 No

what is the initial setting time & maximum duration concrete get hardening for ordinary portlan..

Answer / shaikh shahrukh

30 mins

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

how many cubic feet in one unit of sand?

16 Answers   L&T, PSPCL, Ratna Infrastructure Projects,


What is the meaning of Fe415 ?

6 Answers   Arul Constructions, L&T, SSM,


What is progress payment?

0 Answers  


how can change 12mmdia@150c/c bar spacing to 16mmdia

12 Answers   Amanah Tech, Envoy Group, Globus Constructions,


which steel is better for residential building tmt steel or hysd steel

0 Answers  


What is meant by Anchorage length? Development Length?

10 Answers   HSCC, VHR,


design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal

0 Answers  


what is the ratio of cement water and sand in RCC?

7 Answers   Cimplex, DLF, GMR,


what is the difference between ribbed steel & tor Steel ?

1 Answers  


In IS:456-2000 the workability of concrete is given in mm (slump)in cl.7.1. In IS:10262-1982, cl.3.3.4 & table-6 says +/- 3 percent adjustment is required in the quantity of water (calculated as per table-4 or 5), for each increase or decrease in the value of compacting factor (i.e. workability of concrete) by 0.1. How it is possible to calculate the exact quantity of water required for a particular grade of concrete? What is the relation between Slump & Compacting factor of concrete?

1 Answers   Unitech,


curing of concrete why 7day's,14day's 21day's 28days

5 Answers   Gammon,


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)