which size of box use of cement,sand,aggregate to use the m
20 concrete. i know the quantity of material cement 400 kg
or 8 beg ,662 kg sand and 1200 kg aggregate. i can use only
1 beg cement so pls give me answer . thx in advance
Answers were Sorted based on User's Feedback
Answer / rajesh satapathy
if you know the mix proportion, half of ur problem is solved.
now calculate the weight of sand per bag of cement.i.e 82 kg.
now calculate the volume of box for sand= mass/density.
tak bulk density of sand approx-1400kg/cum.
now ur free to deside the dimension once u got the volume. u can mak it two boxes for easy handling.
Is This Answer Correct ? | 5 Yes | 2 No |
Answer / sjtbehera
it is very simple . you calculate 8 bags
Calculated 1 bag cement ane their respectve sand and
aggregate. after that you calculate volume of box. suppose
you choose sand. per bag it come 82 kg. prepare a box
normally we take 200x300x300. calculate weight of sand by
adding sand in to it. Then you no how many box you have to
pour on mixture.
Is This Answer Correct ? | 13 Yes | 11 No |
Answer / syed
make 35 liter volume capacity box.for
m20 i.e. 1:2:4 take one box cement i.e.
nearly equal to 50kg @ 2 box of sand @
4 box aggregate.
Is This Answer Correct ? | 6 Yes | 8 No |
In 120 m high RCC Chimney shell construction how we can calculate the inner and outer dia of shell at every +1 m level as this shell is inclined from bottom to top.
how to calculate steel columns beams and slab please give me brief calculation
14 Answers Focus, Haven Foundation, Indian Railways, Surya Builders, VICC,
purpose of binding wire in RCC.
How much steel required for 1000 sq ft slab 4" thickness.
M30 Grade Concrete unit weight
37.18kg/qu.cm.Compressive Strength and 10.20% Water Absorption weight,Efflorescence-nil this result use in construction work
what r remedies taken for foundation in black cotton soils..??
what is meant by shear wall?
which member is very strong (strength) after the cross- section area is same, pipe section or solid rod section ? no that's not my question, my question is why pipe section is strong ?
How to repair the Pavement quality conc used for toll plazas if is giving hungry look or honeycombed ? how much cement need to treat 100sqmtr of Damaged PQC
In site how we can identify one way slab and two way slab?
11 Answers Parth Constructions,
Hai, I have applied for APPSC AEE (I&CAD) post.I need previous AEE papers of civil engineering.I hope u will kindly consider this and send.