What is an inverted beam??
Answers were Sorted based on User's Feedback
Answer / busireddyravi
The beam whose bottom level is same that of slab called
inverted beam.
| Is This Answer Correct ? | 151 Yes | 13 No |
Answer / prasad patil
Technically speaking, in inverted beam the top reinforcement
is heavier than bottom reinforcement as the top
reinforcement is in tension & bottom reinforcement is in
compression, however in normal beam the loading conditions
are reverse.
Generally inverted beam is used in cantilever slabs & for
special architectural effects.
| Is This Answer Correct ? | 88 Yes | 15 No |
Answer / nanda kumar.r
The beam whose bottom level is same that of slab called
inverted beam, likely to be used only in top slab of the
building to give good view for inner face of the
building.commonly not preferable now a days.
| Is This Answer Correct ? | 59 Yes | 6 No |
Answer / j k panda
In inverted beam the deflection will take place in top of
the beam.So, major reinforcement will be provided very
opposite to the normal beam as load bearing condition is
reverse.
| Is This Answer Correct ? | 27 Yes | 7 No |
Answer / fahad
Which beam have height above the slab level that we call inverted beam
| Is This Answer Correct ? | 8 Yes | 0 No |
Answer / rekha.k.s
Inverted beam means the top level of the slab and bottom level of the beam will be equal
| Is This Answer Correct ? | 32 Yes | 36 No |
Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,
if there is no alternative of silty sand avail near ,then how it is used in cement mortar or concreting?
where cross hairs in surveying telescope are fitted
# 1. Water observation capacity (MAximum)of Solid bricks # 2. Minimum Crushing Strength of Solid Blocks.
how to find hardness of water?why it should be determined?
you are working as a QC in hihg rise building. when what"s ur responsibilities works?
What are the techniques to measure road difference?
how to calculate amount of materials for concreting and plastering?
what is the specification for silt content in sand
How are freeway bridges built?
what is procedure to find the volume of material in M20 concrete?
A building wall is to be constructed , its 12 ft high and 40 ft long and labour cost per foot is 100 rupees , tell me the total cost of labour for that building work plz explain answer ..I am hurry plz any one give me ans as immediately as possible Thanx
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)