How to take measurement of plastering beam and column.
Answer Posted / mukhram singh
the take column and beam plaster the are taken plaster sq m or sq f.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
400 ku d/c clearess ketan hota hai?
what is thumb rule for calculating the size of ISMB required for a particular length of span
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
how to calculate valuation for the old building?
What is proportion of PCC Grade G?
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
how to calculate MR 9(derivation)
how to workable concrete cube test M-25 design mix
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
Define What is aggregate?
Explain the Strength of brick?
what is the difference between natural draught cooling tower and induced draught cooling tower
sir please send me campus placement questions in civil engineering
what is labour consume factor in residential projects