Answer Posted / dhanraj
BOQ is defined as the bill of quantity
| Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
What is bmc stands for in bmc software?
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
What is kn measurement?
importance of the soundness test to determine the quality of cement use for any construction
what r you reqired for concrete baching plant?
What are the different methods for drawing an arc?
what is smart building materials?
What is oneside mat. And explain
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
how to calculate the weight of concrete
How to calculate unit weight of concrete for m40 grade.
What are the different types of runners?