Answer Posted / b.nagaraju
BOQ -bill of quantity
Bow:- this purpose lot of use
1)required metrials
2) using materials
3)Balence of metrials
4)rates of market
5)monthly bills loss or profit.
All things are coming and project status.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
what is tension column?
What is the maximum strength of cub compress strength in one cub testing
what mean By core Billing
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
What is an object snap mode?
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
what is the design procedure for building
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
What is geopolymer based concrete?
Define What is the origin of name Railway Sleepers?
what is directivity effect?
How to compute minimum number of columns required for a site from area of site?