Answer Posted / b.nagaraju
BOQ -bill of quantity
Bow:- this purpose lot of use
1)required metrials
2) using materials
3)Balence of metrials
4)rates of market
5)monthly bills loss or profit.
All things are coming and project status.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is horizon or horizontal mining?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
difference between trapezoidal and pedestal footing and how the load acts on that
What is meant by cartesian coordinate system?
what is parametre for M25 after 7 days strength
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
what is the design procedure for building
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
How to calculate plastering for elevated water storage tank
What is the strongest bridge for a school contest?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
What is the difference between a wood shake and wood shingles?
How do you calculate reinforcement weight of steel?