Answer Posted / mohd hashiruddin
BOQ is defined as the bill of quantity
in quantity surveying BOQ is prepared to show the cost of the material like no of cemnt bag, sand, brick,etc in a single sheet and sum is added to give the required rate for the various quantity
bill of quantity can be prepared separate for substructure and superstructure
| Is This Answer Correct ? | 12 Yes | 2 No |
Post New Answer View All Answers
Is there any course for billing available in Mumbai? If yes then please mail me the details..
What is Grid floor and mention its advantages ?
sir how can we find the cement and sand required for making 4" drop
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
What is the strength of 1:6:12 mix?
What is a projection line?
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
how to do cementicious paint for rcc walls of cw pump house
How do we test on design and style in a software?
Soil bearing capacity formula
What is portland cement
Explain the different types of building contracts?