whike making bbs we deduct 2d for every bend in bar but theoretically we cant subtract 2d for every bend and for every dia of bar , so plz tell me the exact deduction for bends for different dia of bars and for different angles ??
Answer / jonah
2d is correct increase but during subtraction 1d is to be subtracted as the increase in dia is for one bend.
Is This Answer Correct ? | 1 Yes | 1 No |
Why are the bolts that hold steel rails together in oval holes?
define curing? what is the necessity of curing?
Which of the following countries is associated with the fighter plane 'Dassault Rafale' as its country of origin? A) Israel B) Italy C) France D) Germany
What should be the PH value of water for irrigation purpose
what is the compresive strength of m20 concrete at 7 day
water cement ratio
what shape of coarse aggregates are ideal for concreting?
how to prepare Steel schedule or Bar bending schedule.
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
why elongation index is not required for concreteing coarse aggregate..
What is green building?