Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant...
PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
No Answer is Posted For this Question
Be the First to Post Answer
how to differentiate between "ALL fuel lost" and "All Flame Lost" in Boiler MFT condition?
what is the difference between kg/cm2 to MMWC
what is the difference between flow and force ,draught and vaccum ,tube and pipe?
what are the major duties of a instrumentation engineer in a power plant.?
How We Calibrate the vaccum transmitter?
What is tripping relation between the turbine exhaust pressure and turbine last stage pressure....???
what is the defenation of efficiency in the high pressor boiler? what is the formila of efficiency in the high pressor boiler?
What are the special criteria under which FD fans are switched off during MFT.
what is the trip circuit supervision in an electrical meaning?
By seeing a Power house Can we justify the kV of that power house?
what is restricted earth fault explain in details
what's the moog valve
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)