why prds line tapping taken from ms line as Pri SH O/L temp & pressure is sufficient to full fill our requirement of PRDS..

Answer Posted / hardik085

if tapping is before final super heater thatn starvation come in low temperature superheater.

Is This Answer Correct ?    5 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is restricted earth fault explain in details

1622


Why superheated are started before I'd and rd fan?

1692


can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525

1278


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

513


what does mean by kva rating

995






procedure of how to generate power in solar plant.

1377


what is the meaning of SST300 V56A in SIEMENS turbine

3884


LAPT working in alternator / generator

2544


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

1880


what is the basic use of power plant in equipment

1225


How do you consider that you can improve and what assistance do you need to achieve this

1332


why do you consider yourself a suitable candidate for this position

6977


our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....

1196


what's the moog valve

1050


What is LB-SR.

2483