why prds line tapping taken from ms line as Pri SH O/L temp & pressure is sufficient to full fill our requirement of PRDS..

Answer Posted / hardik085

if tapping is before final super heater thatn starvation come in low temperature superheater.

Is This Answer Correct ?    5 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

1999


what's the moog valve

1134


some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor

2057


Why superheated are started before I'd and rd fan?

1782


What is LB-SR.

2589






what is restricted earth fault explain in details

1707


What is difference between secondary Air & Tertiary Air and Their use.?

1582


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2175


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

618


procedure of how to generate power in solar plant.

1467


why do you consider yourself a suitable candidate for this position

7072


what is natural frequency of turbine shaft .

1837


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

3085


im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much

1591


How do you consider that you can improve and what assistance do you need to achieve this

1415