if we get water mor from 28 days to the rcc concret is this better or have a damag
Answer Posted / santosh
as we know after 28 days concrete attains 90% of its strength
and concrete takes years to attain 100% of its strength so there is no point curing more.it is wastage of water
| Is This Answer Correct ? | 15 Yes | 0 No |
Post New Answer View All Answers
how can we calculate steel value, depending on load
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
What is the diff between cad & cadd?
what is polity
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
What is change order request?
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
how to calculate reinforcment in staircase cranked beam?
How much for the BRC lapping in full yield and half yield < and which table to get it ?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
How to calculate canal slope curvature qty!
Floor tile measurement? Wall to wall or skirting to skirting