if we get water mor from 28 days to the rcc concret is this better or have a damag

Answer Posted / vasudev

right

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6

1022


At what point does a circle start losing area when being flattened?

636


Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.

1995


Critical Path Method is...

1586


what is the max. area can we apply the plate load test ?

1936






whaat is blister in box girder bridge and what is its function..

4387


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

1779


What is the difference between Hinged and pinned in Column ends

4786


As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low

1069


How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.

1792


How to increase a bearing capacity of soil?

659


how to caliculate required amount of cement and sand required for 1cu.m.

1744


what values & beliefs have guided you in your career path

2780


How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?

1879


What is hybrid foundation?

687