How many cum of 9.5mm stone in 1 ton ?
No Answer is Posted For this Question
Be the First to Post Answer
how to calculate for ramp slop?
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
width rangs in NH,SH in one-way lane &two-way lane why we are provid caber is there any reson for that
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
what will be the grade for M 30 ,35,40,45,50,55???
Is there any software to prepare the Estimate of building.Plz tell me.......
what could be the production cost of 1 cum of concrete by CP30 plant
how many bricks are consumed for 01 Cum of brick work
How much quantity of Cement and Sand required for Cement Sand Ratio of 1:1 and volume of pile is 0.61 m3
mix design concrete m30 for elevated water tank
how much cement and sand required for 100sqm of wall plastering in different proportions
0 Answers Bharti, Pvr Constructions,
qube strenth in 7nth days test
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)